How to run a commissioned dryer day to day: what the front-panel LED means, the start-up and shutdown order, the regeneration settings, what to watch while it runs, and PLC integration. The app screens and exporting records are in the Control app chapter.
- Start orderDryer first, then HXB-V1
- Regeneration defaults12 h cycle · 150 °C
First timeRead just two sections first: the front-panel LED and daily start-up. Those two are enough to run the dryer every day; the rest is reference for when you need it.
Done this beforeGo straight to the monitoring table.
On this pageFront-panel LED
Front-panel LED#
A single LED on the front panel shows the unit's state by colour. The colours mean the same as on the HXB-V1. For the detailed state, check the Status field at the top of the control app.
| State | Colour | Meaning |
|---|---|---|
| Running | Green | The regeneration cycle is running and the unit is drying hydrogen |
| Standby | Yellow | Power is on but the unit is not running |
| Emergency stop | Red | An emergency stop is active. Find the cause, then clear it with Release in the app |
Daily start-up#
Switch the dryer on first and start the HXB-V1 units after it. The first start is done with us, as in the First start chapter.
Before you start#
- There is no active emergency stop (ES) or fault stop (FS) alarm in Alarms & Events.
- The PURGE, DEPR. and DRAIN vents run to safe discharge points and are unobstructed. There are no valves in the vent lines.
- The line after H2 OUT is open, so the product hydrogen has somewhere to go.
- The air openings at the rear of the unit are clear.
Sequence#
- Switch the HXD-V1 on at ON/OFF.
- Start the dryer project in the app and check MQTT ONLINE.
- On the P&ID screen, turn Temperature Control ON. Check the regeneration temperature.
- Turn Cycle time control ON.
- The cycle cannot start while Temperature Control is off.
- Start the HXB-V1 units. Once inlet pressure rises, the dryer moves from STANDBY into operation.
Regeneration settings#
The three settings below are the ones you can change on the dryer. Change them under Temperature Control and Cycle time control on the control app's P&ID screen.
| Setting | Default | Range |
|---|---|---|
| Cycle time | 12 h | 1–48 h |
| Heating time | 6 h | At least 30 minutes, and at least 40 minutes shorter than the cycle |
| Regeneration temperature | 150 °C | 50–200 °C |
- Keep the defaults unless HydroXpand advises otherwise.
- A longer cycle leaves the online tower taking up water for longer. If the outlet dew point rises, first check that this setting has not been changed.
- If a tower runs 30 °C or more above the regeneration temperature, the unit makes an emergency stop (ES_03).
Monitoring during operation#
During operation, watch the values below on the P&ID and Dashboard screens. Outside the normal range the unit warns or stops, with the alarm code shown in the right-hand column.
| Watch | Normal | Outside the range |
|---|---|---|
| Status | Cycles through HEATING, COOLING, IDLE and SWITCHING | For STANDBY or EMERGENCY, see the operating states table |
| Inlet pressure | 9.5 barg or above (10 barg standard) | Below 8.5 barg: STANDBY. Above 15 barg: emergency stop (ES_05) |
| Tower temperatures | Rises to the regeneration temperature (150 °C by default) while heating and falls to 40 °C or below before the switch | Not reached within the heating time: FS_09. 30 °C or more above the regeneration temperature: emergency stop (ES_03) |
| Adsorber inlet gas temperature | 80 °C or below | Above it: warning (WA_08) |
| Outlet dew point (option) | -70 °C or below | Above it: warning (WA_06). Above -65 °C for ten minutes: stop (FS_08) |
| Alarms | No active alarm | Look the code up in the alarm tables |
Trends matter more than a single reading. Follow them with the temperature and pressure charts on the Dashboard and the daily and monthly items in the check lists.
Normal shutdown#
To stop, reverse the start order and stop the HXB-V1 units first. To take the unit out of service for storage or return, follow the shutdown steps in the Decommissioning chapter.
- Stop hydrogen production at the HXB-V1 units.
- Turn Cycle time control OFF, then Temperature Control OFF.
- Temperature Control cannot be turned off while the cycle is running.
- For a long stop, switch off at ON/OFF. Do not open a tower that was heating until it has cooled.
PLC and SCADA integration (Modbus TCP)#
The dryer supports Modbus TCP over Ethernet. Instead of the control app, your site PLC or SCADA system can take the operating state and readings and integrate the unit into your plant.
Ask us through a technical enquiry and we will send the latest register map. Agree the scope of integration with us when you order.
What this chapter is based on
- HXD-V1 datasheetPDF · 3.2 MB
- HXD-V1 outline drawingPDF · 368 KB
- First start checklistPDF · 61 KB
- Routine check sheetPDF · 66 KB
- Maintenance logPDF · 49 KB
- HXD-V1 user manualPDF · 2.7 MB
Thank you. We read every answer.
Tell us what was missing and we will fix this page. Tell us what was missing →
Ask the engineer who built it
If your case is not covered here, send us the operating condition and what you observed. The engineer who designed the system answers directly.