The HXD-V1 is a modular dryer that takes the water out of the hydrogen leaving an HXB-V1. It has the same 19-inch rack format as the HXB-V1, so the two can sit in the same rack.
This chapter covers where the HXD-V1 goes, the line from the HXB-V1, the vents and drain, and power and network. Putting several units in one rack is in the Use with HXB-V1 chapter, and the HXB-V1 side is in the HXB-V1 upstream and downstream chapter.
- Works withHXB-V1, 10 barg version, up to five units
- When to readBefore you order, and before you choose the site
First timeCheck what to decide before installing against your HXB-V1 order, and draw the pipework from the port table.
Done this beforeRe-check just the vents and drain section. That is what usually catches you when the pipework changes.
On this pageWhat to decide before installing
What to decide before installing#
- The HXB-V1 pressure version. The HXD-V1 is designed to take pressurised hydrogen and needs at least 10 barg at its inlet. It pairs with the 10 barg HXB-V1 and cannot be fed from a 0 barg unit. HXB-V1 pressure is fixed at order, so settle it when you order the HXB-V1.
- How many HXB-V1 units it serves. One HXD-V1 takes up to five HXB-V1 units. The pipework for several units is settled with us at order.
- The pressure at the point of use. The HXD-V1 runs at 10 barg as standard. If your application needs more, you need a compressor; if it is sensitive to pressure swings, you need a separate regulator. Higher pressure, up to 35 barg, is by agreement.
- Where the vents discharge. The HXD-V1 vents gas containing hydrogen as it runs. Decide first how the lines reach a safe outdoor discharge point.
- Power and network. You need one 200-240 V AC single-phase supply and one Ethernet connection for control.
Where it goes#
- Indoors, in a ventilated area classified as non-hazardous. The HXD-V1 is not certified for use in hazardous areas (ATEX or IECEx zones).
- It takes 6U of a 19-inch rack. It is 613 mm deep from the front panel to the rear, with 30.7 mm of fittings and 36.5 mm of handles at the front, 650 mm at most in all. Leave extra room at the back so tubing and cables are not bent sharply.
- Fans at the rear ventilate the enclosure. Keep the front and rear of the rack free.
- Put it in the same room and under the same ventilation as the HXB-V1. It handles hydrogen, so the HXB-V1 site requirements apply as they are.
Rack mounting#
Fix the front panel with four screws through the rack slots (465 mm centres). Support the body on rack rails or a shelf. The front screws alone are not designed to carry the unit.
In the standard HydroXpand rack (42U), the HXD-V1 sits at the bottom with five HXB-V1 units above it. See the Use with HXB-V1 chapter.
Ports and connections#
All ports and connectors are on the front panel. There are six fluid ports, all 1/4-inch tube bulkheads. The numbers match the outline drawing.
| No. | Port | What it does | Connect to |
|---|---|---|---|
| 1 | H2 IN | Wet hydrogen inlet | The HXB-V1 H2 OUT |
| 2 | H2 OUT | Dry hydrogen product outlet | Your point of use, or compression and storage |
| 3 | H2 SAMPLE OUT | Sample outlet for an analyser | A dew-point or purity analyser; cap it if unused |
| 4 | PURGE | Regeneration purge vent | A safe outdoor discharge point. Never block it |
| 5 | DEPR. | Depressurisation vent | A safe outdoor discharge point. Never block it |
| 6 | DRAIN | Condensate drain | Through a liquid trap into a hydrogen vent route |
| 7 | ON/OFF | Power inlet, main switch and fuses | 200-240 V AC single phase, IEC C14 |
| 8 | Ethernet | Control and status communication | The control PC's network, RJ45 |
| 9 | LED | One status indicator. For the colours, see the control app chapter | None |
| 10 | Button | Control button | None |
Connecting to the HXB-V1#
- Work with both the HXB-V1 and the HXD-V1 powered off. If the HXB-V1 still holds pressure, depressurise it first following the HXB-V1 handbook.
- Run stainless steel tube and fittings rated for hydrogen and for the full operating pressure from the HXB-V1 H2 OUT to the HXD-V1 H2 IN.
- Put no pressure regulator or relief valve in this run. The pressure-control valve at the HXD-V1 outlet sets the pressure for the whole line from the HXB-V1 through the HXD-V1. A second regulator upstream makes the HXD-V1 run below its set pressure, which raises the water load and cuts drying performance.
- If you fit a manual isolation valve, it must be open whenever the system runs. Starting with it closed puts backpressure on the HXB-V1 outlet.
- Lay the tube level or falling from the HXB-V1 towards the HXD-V1. Do not create a low point where water can pool; if one is unavoidable, fit a drain there.
- Hydrogen from the HXB-V1 is saturated with water and can carry electrolyte droplets. The HXD-V1 separates that water at its inlet and sends it out through DRAIN.
- Connect the HXD-V1 H2 OUT to your point of use. If you have an analyser, connect it to H2 SAMPLE OUT with a needle valve to set the sample flow; if not, cap that port.
- Once every joint is made up, the leak test is done with us at first start. See the First start chapter.
After the outlet#
What to keep to when you send the dry hydrogen from H2 OUT to your point of use, a compressor or storage.
- Hydrogen flows only while the pressure after H2 OUT is below the operating pressure (10 barg standard). Filling a vessel directly, the flow falls as the vessel approaches the operating pressure. To store at a higher pressure, put a compressor after H2 OUT.
- When you choose a compressor, check that its minimum suction pressure is below what H2 OUT can deliver.
- Do not run with a valve after H2 OUT closed. System pressure rises, and above 15 barg the unit makes an emergency stop (ES_05). Check the path is open before you start.
- Give the downstream and storage equipment overpressure protection that meets your codes and design. The dryer's own protection does not protect the equipment after it.
Vents and drain#
The HXD-V1 alternates between two adsorption columns. While one takes up water, the other is heated to release what it caught, and a little dry hydrogen sweeps it out through PURGE. When the columns swap, the remaining pressure is let down through DEPR. Both vents carry gas that contains hydrogen.
- Run PURGE and DEPR. as separate lines, or into a vent header sized so that neither can build backpressure.
- End the vents at a safe outdoor discharge point, above roof level or where your site risk assessment approves, away from ignition sources, air intakes and walkways, with a rain cap.
- DRAIN releases hydrogen along with the condensate. Do not send it to a floor drain or open gutter: pass it through a liquid trap that catches the water and sends the gas into a hydrogen vent route.
- Never join an HXD-V1 vent to the HXB-V1 O2 OUT. If you want to share a line with the HXB-V1 H2 VENT, ask us first: backpressure from one can reach the other unit.
- The vent gas is wet. Slope the lines and put a drain at the low points. Where they can freeze, insulate them or add heat tracing.
Power and network#
- Power is 200-240 V AC single phase, 50/60 Hz, through the IEC C14 inlet. The inlet includes a 2-pole main switch and fuses. Consumption is at most about 300 W, during regeneration heating.
- Plug it into an earthed outlet on a circuit with overcurrent protection. The regeneration heaters run directly on the AC supply.
- Connect Ethernet (RJ45) to the same network as the HXB-V1 control PC. The unit supports Modbus TCP and MQTT with JSON payloads. For PLC integration, see the control app chapter. Firmware is updated over Wi-Fi.
First start#
Once the pipework and power are done, the first start is done with us. What to prepare and what happens are in the First start chapter.
What this chapter is based on
- HXD-V1 datasheetPDF · 3.2 MB
- HXD-V1 outline drawingPDF · 368 KB
- First start checklistPDF · 61 KB
- Routine check sheetPDF · 66 KB
- Maintenance logPDF · 49 KB
- HXD-V1 user manualPDF · 2.7 MB
Thank you. We read every answer.
Tell us what was missing and we will fix this page. Tell us what was missing →
Ask the engineer who built it
If your case is not covered here, send us the operating condition and what you observed. The engineer who designed the system answers directly.