This setup is a good fit when
- You want to produce on site the modest volume of hydrogen currently delivered in cylinders or tube trailers
- You have a process that continuously uses approximately 1 kg of hydrogen per day
- You need to monitor operating status remotely or connect the system to an EMS
- You want to start at the 2 kW scale and expand production capacity later
Named customer cases
No public named case is available in this field yet. Review the recommended setup and validation scope below, then send us your requirements. Request a review →
Recommended setup
HXB-V1
2 kW system0.5 Nm³/h (1 kg/day), 200–240 V AC single phase and automatic water refill. Remote access to the computer running the desktop app enables off-site monitoring and control; unattended operation depends on the site risk assessment, ventilation and applicable regulations
Recommended productHXS-2
2 kW stackAs a spare stack or to integrate with your own BoP
Recommended product30 kW
Turnkey system (launch Q2 2027)A turnkey on-site unit integrating HXS-30 with BoP, power and controls
Worth checking first
| Purity | Without a dryer, purity is 98 to 99% at 0 barg and approx. 99% at 10 barg. Under our validated conditions, a zeolite moisture-removal dryer alone achieved at least 99.999%; additional purification depends on the required purity, dew point and measurement basis. |
|---|---|
| Installation | Operating 5 to 45 °C, indoor recommended, IP20, fan based thermal management. |
| Integration | Connects to your EMS over MQTT (JSON) on Ethernet. Modbus is not supported. |
Talk to us about this use case
Tell us the use case and target output, and we will review the right product configuration and quotation scope.