← ProductsStacks

HXS-2 2 kW AEM water electrolyzer stack

Available

Integrate HXS-2 into your BoP using defined interfaces and operating guidance, supported by performance curves, long-run data and 23-cell uniformity.

2 kW stack
Rated production500 L/h · 1 kg/day
MEASUREDContinuous run2,400 h+
Production pressureH₂ side up to 10 barg
Operating power2 kW
Is this the right product?

Can it integrate with my BoP, and is there enough data for a technical review?

HXS-2 is a stack for customers designing their own power, circulation, separation and safety systems. Performance evidence, interfaces and service conditions must be reviewed together.

Choose this product when
  • You are developing your own BoP or system and need a validated stack
  • You need a spare or replacement stack for an existing system
  • You want to evaluate performance and durability at stack level yourself
Product and supply boundary

The BoP before and after the stack remains in your integration scope

HXS-2 includes the stack, interface specifications and operating guidance; the customer designs the power, circulation, separation and safety systems.

CUSTOMER01

DC power and temperature control

Power and thermal management sized for the operating range

HYDROXPAND02

HXS-2

23-cell stack with interfaces and operating guidance

CUSTOMER03

Circulation, separation and safety

Electrolyte loop, gas-liquid separation and site safety systems

HYDROXPAND

Included supply scope

  • Compression-assembled stack and product-specific connection specifications
  • Recommended operating conditions and available performance data
  • Exterior/enclosure-only STEP model on request (internal parts and flow fields excluded)
CUSTOMER

Customer preparation

  • Electrolyte circulation loop and pump (standard flow 4 L/min)
  • DC power supply sized for the operating current range
  • Temperature control, gas and liquid separation, hydrogen safety equipment
  • Management of the anode to cathode pressure difference (a larger difference increases crossover)
Validation evidence

See the conclusion first, then open the full test data

Measured results, catalogue data and design targets remain clearly separated. Full charts retain their test conditions.

MEASURED01

The ambient and pressurized curves show full-stack voltage across current.

MEASURED02

Stack voltage and H₂-in-O₂ were recorded together during constant-current long-run operation.

MEASURED03

Individual cell voltages show the uniformity across all 23 cells.

Open full charts and test conditions3 datasets
MEASURED

The ambient and pressurized curves show full-stack voltage across current.

i-V curve · 23-cell full stack · 0.1 M KOH · 50 °C · ambient/pressurized

i-V curve · 23-cell full stack · 0.1 M KOH · 50 °C · ambient/pressurized
MEASURED

Stack voltage and H₂-in-O₂ were recorded together during constant-current long-run operation.

Published data window · 2,281 h · 0.3 M KOH · 40 °C · 50 A · full-run linear fit 80.2 µV/h/cell

Published data window · 2,281 h · 0.3 M KOH · 40 °C · 50 A · full-run linear fit 80.2 µV/h/cell
MEASURED

Individual cell voltages show the uniformity across all 23 cells.

23-cell voltage uniformity (avg 1.689 V · σ 0.010 V)

23-cell voltage uniformity (avg 1.689 V · σ 0.010 V)
Technical details

Open only the details you need

Full specifications, support terms and review documents remain available without interrupting the first product decision.

Complete product specifications15 items
H₂ productionUp to 500 L/h (1 kg/day)
Efficiency (HHV)88% (BOL · 0.3 M KOH · 60 °C) · 45 kWh/kg-H₂
Long-run validation2,400 h+ · 23 cells · 0.3 M KOH · 40 °C · 50 A · approx. 77 µV/h/cell
Rated operating condition0.1 M KOH · 50 °C (negotiable)
Energy use2 kW (at 50 A)
Water consumption420 mL/h (50 A)
Number of cells23
Active area100 cm² (anode) / 79 cm² (cathode)
ElectrodesHXP-an · HXP-ca
Dimensions190 × 210 × 215 mm
Weight19 kg
StructureNiFe anode · Pt/C cathode · AEM
Fluid portsKOH IN 3/8″ · O₂+electrolyte OUT 3/8″ · H₂ two ports 1/4″ (double-ferrule)
DC terminalsM6 · torque 4–6 N·m
External circulation4 L/min (standard)
Support, lead time and commercial terms3 items
Service & reassembly

Disassembly and reassembly require our dedicated gaskets and about 7 tonnes of clamping force, so conditions are agreed with us in advance. Return service can replace only the MEA and reuse the hardware; the service scope and terms are fixed in the quotation.

Lead time & status

Available · 4 weeks from PO acceptance

Commercial terms & origin

EXW basis; DAP and other terms by agreement. Country of origin is the Republic of Korea, with certificate of origin provided.

OTHER OPTIONS

A nearby product may fit better

Compare only the closest alternatives instead of reopening the full product catalogue.

PROJECT REVIEW

Review the BoP integration conditions

Send the target output, pressure, operating condition and current BoP plan, and we will review the interface.

Review BoP integration