Available nowHXB-V12 kW integrated AEM system

Stack and BoP in one rack.
Produce 1 kg of hydrogen per day.

HXB-V1 integrates the HXS-2 electrolyser stack with power, electrolyte circulation, gas separation, pressure control and safety in one 19-inch 6U rack. Set voltage, current, electrolyte temperature and flow directly from the desktop app.

Rated H₂ output
500 L/h1 kg/day
Output pressure
0 / 10 bargSoftware selectable
Standard lead time
8 weeks
HydroXpand HXB-V1 integrated 2 kW AEM water electrolysis system
OPERATING CONTROLVoltage · current · electrolyte temperature · electrolyte flow
STACK SERVICERemove · disassemble · replace
HXB-V1 SYSTEM BOUNDARY

HXB-V1 produces hydrogen
and connects to the equipment your site requires.

HydroXpand supplies HXB-V1 and helps review its connections to site utilities and downstream equipment. A modular dryer is in development; for immediate needs, we can recommend a suitable partner product. Compression, storage and end-use equipment remain within the customer or integration partner scope.

01Customer scope

Site inputs

  • Power
  • Treated water
  • Ventilation & outlet piping

Prepare the utilities required to install and operate HXB-V1.

02HydroXpand supplyAvailable now
HXB-V1Integrated 2 kW AEM system
Rated H₂ production
500 L/h · 1 kg/day
Software-selectable
0 / 10 barg
03Configured by project

Downstream equipment

Purification & dryingHydroXpand module
In development
Compression · storage · useSelected for the required pressure, storage method and application
Customer / partner scope
Choose your supply boundary

Choose HXS-2 when your team
will build the BoP.

Start with HXB-V1 for an integrated system, HXS-2 when your team will build the BoP, or research cells and electrodes when the project begins with evaluation.

01
Will your team build and integrate the BoP?

Integrated system or stack: where the supply boundary sits

HXB-V1 reduces the equipment your team must integrate. Choose HXS-2 when power, circulation, separation, controls and safety are already in your scope.

Available
Discuss BoP or system configuration
02
Will your team run the electrochemical testing?

Start with materials and MEA evaluation

For teams screening an electrode or MEA, defining cell conditions or moving from a single cell into a short stack.

Available
Discuss evaluation conditions

Comparing the products

The seven products side by side. Available and in-development items are marked so you can tell them apart, and a dash means we do not publish that figure for that product.

ItemHXB-V12 kW systemHXS-22 kW stackHXS-0Single cell · short stackHXP-anAnode (NiFe-LDH)HXP-caCathode (catalyst coated)HXS-3030 kW stack30 kW30 kW system
StatusAvailableAvailableAvailableAvailableAvailableShort stack available · 46-cell full stack Q4 2026In development · product launch Q2 2027
H₂ output500 L/h (1 kg/day)500 L/h (1 kg/day)---7,500 L/h (15 kg/day · design)7,500 L/h (15 kg/day · design)
Efficiency (HHV)Stack 88% (BOL · 0.3 M KOH, 60 °C · 45 kWh/kg)88% (BOL · 0.3 M KOH, 60 °C · 45 kWh/kg)---Design 84% (conservative, 46 cells · 47 kWh/kg) · 90.7% on a 5-cell test (43 kWh/kg)To be published when specifications are fixed
Energy use (kWh/kg-H₂)Stack 45 · system 5445---47 (46-cell design)To be published when specifications are fixed
Cells23 (one stack included)231–20--4646 (one HXS-30 included)
Standard format482 × 645 × 266 mm · 53 kg190 × 210 × 215 mm · 19 kgActive area 1–25 cm² · 4 kg200 × 300 mm (300 µm) · 100 × 100 mm (3 mm)200 × 300 mm (260 ± 20 µm)570 × 400 × 330 mm · 120 kgTo be published when specifications are fixed
Outlet pressure0 or 10 barg · software-selectableUp to 10 barg on the H₂ side---Up to 10 barg on the H₂ sideUp to 10 barg on the H₂ side
Best forOn-site production · demonstrationIntegration with your BoP · spare stackPerformance evaluation · condition screeningMEA fabrication · stack evaluation · lab testingMEA fabrication · single cell evaluationScale-up beyond kW class30 kW-class on-site production · demonstration
Lead time8 weeks4 weeks4 weeks2 weeks (custom up to 2 months)2 weeks (custom up to 2 months)4 weeksProduct launch Q2 2027

Lead times run from acceptance of the purchase order. Figures come from the product catalogue and the customer FAQ; anything outside our verified range is left blank.

In development

Expanding the portfolio to a 30 kW system
and modular hydrogen drying

Alongside the HXS-30 full stack, we are developing a 30 kW integrated system and a modular hydrogen dryer for multi-unit HXB-V1 deployment.

View HXS-30 development details

In development · HXS-30 5-cell and 15-cell short stacks available for development projects

STACKIN DEVELOPMENT

46 cells

HXS-30 full stack

A 30 kW-class stack extending the HXS-2 material platform to a larger active area.

46-cell full stack · available Q4 2026
SYSTEMIN DEVELOPMENT

30 kW

Integrated AEM system

A single-skid system integrating the HXS-30 stack with balance of plant, power electronics and controls.

Target · Q2 2027
H₂ DRYINGIN DEVELOPMENT

2.5 Nm³/h

Modular H₂ dryer

A shared modular dryer designed for the hydrogen output of one to five HXB-V1 systems.

Design basis · 3D design complete

The dryer flow rate is the current design basis; final specifications will be set after prototype testing.

HXB-V1 purchase enquiry

Review your HXB-V1 application with us.

Share the target output, pressure, operating hours, site power, feedwater and downstream equipment. An engineer will recommend the HXB-V1 configuration and define the quotation scope.

Request HXB-V1 quote