What you need between delivery and the system sitting in its place, including where our supply ends and your site begins.
Installation must be done by someone familiar with hydrogen safety, electrical safety and alkaline electrolyte handling. Read the safety chapter first.
- Weight51.3 kg · two people or more
- ClearanceFront 300 mm · rear 400 mm
- Load100 kg or more
- Ambient5–45 °C
First timeStart with unpacking and incoming inspection on the day it arrives. Reading the site and battery-limit sections before delivery makes the preparation quicker.
Done this beforeThe site conditions and the battery-limits table are all you need.
On this pageWhat arrives and what you prepare
What arrives and what you prepare
Included
The HXB-V1 itself
The user manual, sent electronically
The factory acceptance test document
Prepare separately unless ordered
Electrolyte, the KOH solution
DI water
The Ethernet cable and the AC power cord
A hydrogen dryer, if you need a lower dew point and higher purity
Photos show the type of item only. Water container photo by Safilol222299 (Wikimedia Commons, CC BY-SA 4.0, background removed and edited). The edited version is released under CC BY-SA 4.0.
Your site provides
A control PC or laptop
A chemically compatible container for the electrolyte
A container for DI water make-up
A drain container for used electrolyte
KOH-compatible tubing and fittings
Whatever valves, sensors and safety or relief devices your site design requires
Photos show the type of item only. Water container photo by Safilol222299, tubing photo by Best Tech Nick 25 (Wikimedia Commons, CC BY-SA 4.0, background removed and edited). Both edited versions are released under CC BY-SA 4.0.
Unpacking and inspection
Where it goes
- Surface or rack
- A stable, level surface or a 19-inch 6U rack. It must support at least 100 kg, counting the unit plus hoses and cables.
- Front clearance
- At least 300 mm, so you can connect and disconnect tubing, plug in power and Ethernet, see the LED and reach the power switch.
- Rear clearance
- At least 400 mm. Do not block the rear exhaust airflow.
- Ambient temperature
- 5–45 °C
- Ventilation
- Indoors, well ventilated. Not in a sealed room or a small unventilated enclosure.
- Ceiling
- Hydrogen is lighter than air and collects high up. Avoid covered ceiling spaces where it can accumulate.
- Discharge points
- Decide where O2 OUT, H2 OUT and H2 VENT each discharge safely before you start.
- Hydrogen detection
- If your site risk assessment calls for it, fit a detector and put alarm and response procedures in place.
Before installation
Battery limits
What is inside the one box and what belongs to your site. When you review a quotation, line it up against this boundary first.
- Inside the unit
- The stack, the electrolyte tank and circulation pump, the heat exchanger, the heater, power conversion, control and instrumentation, and the safety interlocks. You do not have to assemble a separate balance of plant.
- Upstream is yours
- The DI water supply, making up and storing electrolyte, the incoming power and breaker, and earthing.
- Downstream is yours too
- Vent and exhaust routing, the dryer, compression and storage, the connection to the point of use, and whatever overpressure protection the code requires.
- Who repairs what
- Repair and replacement of site equipment is the customer's responsibility. We interpret the alarms and operating trends to judge the system's behaviour and tell you whether factory service is needed.
What this chapter is based on
- HXB-V1 datasheetPDF · 2.1 MB
- HXB-V1 outline drawingPDF · 1.9 MB
- HXB-V1 user manualOn request
Ask the engineer who built it
If your case is not covered here, send us the operating condition and what you observed. The engineer who designed the system answers directly.