Shut down and disconnect external connections before moving or storing the system. This is not a procedure for opening the stack.
- PersonnelQualified personnel
- PreparationChemical PPE · drain container · port caps
First timeConfirm shutdown, power isolation and depressurisation before draining and disconnecting.
Done this beforeReview the work sequence and storage conditions.
On this pageDecommissioning and storage
Decommissioning and storage#
- Bring it to standby with a normal shutdown.
- Switch power control off and confirm the current drops to 0 A.
- Keep electrolyte control on briefly to cool down.
- Switch electrolyte control off and let it cool toward ambient.
- Before powering down, confirm in the app that the hydrogen pressure is released.
- On a 10 barg unit, press Emergency STOP in the control app to release the pressure through H2 VENT.
- Go on only when the hydrogen pressure on the Dashboard (PT301, PT302) has come down to 0.
- Power it down completely.
- Switch the main power off and unplug the power cord.
- Drain the electrolyte.
- Put on chemical PPE and prepare compatible containers.
- With a container under DRAIN, remove the cap, fit 1/4″ tubing and tighten the nut, leading it into the container. There is no valve, so it flows the moment the cap is off. Drain until the flow stops.
- Undo the tubing carefully and refit the cap.
- Disconnect the tubing.
- Never loosen a fitting to vent gas. Disconnect only after shutdown, depressurisation and draining are done.
- Cap each port as you go, to keep dirt and moisture out and residual liquid in.
- Finish with a visual check around the front-panel ports and fittings for leakage and unusual smell.
Disposal#
- Drained electrolyte is strongly alkaline waste. Never pour it into a drain or storm water; label the container with contents and concentration and hand it to a licensed waste contractor.
- Treat rags and gloves used on electrolyte as the same waste.
- Contact us before disposing of the unit or the stack. We will advise how to handle the stack and electrodes.
After disconnection#
Check that the power cord is disconnected, disconnected ports are capped, and no leakage is visible around ports and fittings. Residual liquid remains, so prevent freezing in storage.
What this chapter is based on
- HXB-V1 datasheetPDF · 4.5 MB
- HXB-V1 outline drawingPDF · 1.6 MB
- First start-up checklistPDF · 72 KB
- Routine check sheetPDF · 73 KB
- Maintenance logPDF · 48 KB
- Electrolyte logPDF · 73 KB
- HXB-V1 user manualPDF · 7.5 MB
- EU declaration of conformity (CE)PDF · 122 KB
Thank you. We read every answer.
Tell us what was missing and we will fix this page. Tell us what was missing →
Ask the engineer who built it
If your case is not covered here, send us the operating condition and what you observed. The engineer who designed the system answers directly.