← ProductsSystems

HXB-V1 2 kW turnkey AEM electrolyzer system for 1 kg of hydrogen per day

AvailableCE Declaration of Conformity (LVD, EMC, RoHS)

HXB-V1 is a turnkey system that combines the anion exchange membrane (AEM) stack, power, circulation, temperature control and safety functions in one 19-inch 6U rack, producing 1 kg of hydrogen per day on site for connection to downstream site equipment.

The HXB-V1 is a 2 kW turnkey hydrogen generator that integrates the HXS-2 stack with power, electrolyte circulation, gas separation and safety in a single 19-inch 6U rack, rated at 480 NL/h (1 kg/day) and available to order. It ships eight weeks from PO acceptance.

2 kW system
Rated production480 NL/h · 1 kg/day
Production pressure0 / 10 barg

Selectable in software

OPTIONH₂ purity≥ 99.999%

With dryer

Operating power2.4 kW

BOL · 50 A

Who it is for

A complete 2 kW system that produces hydrogen on site

HXB-V1 is the 2 kW electrolyzer as a complete system; if you only need the 2 kW stack for your own BoP, that is the HXS-2. Installation feasibility depends on power, water, ventilation, outlet piping and the boundary to purification, drying, compression and storage.

Choose this product when
  • Sites using modest volumes of hydrogen continuously where delivery logistics are a burden
  • Demonstration or research projects that use remote access to the computer running the desktop app for off-site monitoring and control
  • Configurations that connect downstream to drying, storage and compression
SITE CONNECTION

What HXB-V1 covers and what the site provides

HXB-V1 integrates the core functions needed to produce hydrogen. Storage, compression and end-use equipment are configured separately for the site.

CUSTOMER01

Power and feedwater

200–240 V AC single phase · Type II feedwater

HYDROXPAND02

HXB-V1

Integrated stack, power, circulation, controls and safety

OPTION03

Hydrogen drying

Not standard · modular product in development

CUSTOMER04

Storage, compression and use

Downstream equipment for the site application

HYDROXPAND

Included supply scope

  • Integrated 2 kW stack, power supply, electrolyte circulation, temperature control, automatic water refill and safety logic
  • Desktop control app and an MQTT over Ethernet (JSON) interface
  • Dryer not included as standard · modular dryer in development · partner product can be recommended when needed immediately
  • Dimensional data and an exterior/enclosure-only STEP model available for installation planning
CUSTOMER

Customer preparation

  • 200–240 V AC single phase 50/60 Hz (total consumption approx. 2.4 kW)
  • A feed-water tank, recommended quality ASTM D1193 Type II (1.0 µS/cm or below at 25 °C), maximum 30 µS/cm
  • H₂ and O₂ outlet, vent and drain piping, plus use, storage or compression equipment
  • An indoor 5–45 °C installation environment, ventilation and site hydrogen safety measures
COMPONENTS AND BOPWhat attaches on either side of HXB-V1The BoP is built in, so only upstream and downstream are left to decide
Integrated operation

One unit covers the essential operating loop

Review the integrated hardware first. Open the software views only when you need the detailed daily workflow.

System layout · exploded view
System layout · exploded view
INTEGRATED

The 6U unit combines the core operating functions

  • AEM stack and DC power
  • Electrolyte circulation and temperature control
  • Automatic water refill and operating sensors
  • Control and safety logic
Open the operating software views3 views
OPERATIONS SOFTWARE

The daily operating loop in three views

Monitor the system, inspect the process state and define an operating protocol. Additional software views are available during a technical review.

Control app · Dashboard
Control app · Dashboard
Specifications

HXB-V1 specifications and supply terms

The specification table, support terms and review documents.

Production performance5 items
H₂ production480 NL/h (approx. 1 kg/day)
Energy use (kW)2.4 kW (BOL · 2.0 stack + 0.4 BoP)
Energy use (kWh/Nm³)4.8 (BOL)
Energy use (kWh/kg-H₂)Stack 44 · system 56 (the difference, about 12 kWh/kg, is the BoP)
Operating current15–67 A (50 A recommended)
Hydrogen purity & pressure3 items
H₂ purity @ 0 barg98–99% (no dryer) · ≥ 99.999% (with dryer)
H₂ purity @ 10 barg99% (no dryer) · ≥ 99.999% (with dryer)
H₂ pressure0 or 10 barg · selectable in software
Power & water5 items
Power supply200–240 V AC · 50/60 Hz · single phase
Water conductivityRecommended ASTM D1193 Type II (≤1.0 µS/cm) · in-service ≤30 µS/cm
Water consumption0.55 L/h (50 A · 60 °C)
Feed water top-upBuilt-in gear pump refills automatically
ElectrolyteKOH 0.1–1 M · circulation 2–5 L/min
Installation7 items
Ambient temp5–45 °C
IP ratingIP 20
Dimensions482 × 647 × 266 mm (6U)
Weight51.3 kg
Fluid connectionsH₂O · H₂ · O₂ · VENT · DRAIN 1/4″ double-ferrule
Power inletC20 AC inlet (C19 cable)
Installation clearanceFront ≥ 300 mm · rear ≥ 400 mm
Controls & communications4 items
ControlDesktop app (MQTT/Ethernet)
Direct controlVoltage · current · electrolyte temperature · electrolyte flow
Stack handlingRemovable · disassemblable · replaceable
Telemetry1 s interval · 8 external control variables (Modbus not supported)
Safety & warranty2 items
SafetyH₂ detection · E-STOP · interlocks · electrolyte tank pressure switch auto-stop
Warranty12 months from shipment, or from acceptance where an acceptance procedure applies (consumables excluded)
Support, lead time and commercial terms3 items
Support & warranty

One-year warranty under standard operating conditions. Routine checks cover feedwater, leaks and operating data; KOH is replaced by condition rather than on a fixed interval. A returned stack can be refurbished by replacing only the MEA and reusing the hardware.

Lead time & status

Available · 8 weeks from PO acceptance

Commercial terms & origin

EXW basis; DAP and other terms by agreement. Country of origin is the Republic of Korea, with certificate of origin provided.

Pricing depends on quantity and Incoterms, so it is issued as a quotation. Before asking for one, compare five years of buying cylinders against making the same hydrogen on site.

Cost vs cylinders calculator
Enquiry

Installation and downstream review

Send the operating hours, purity, pressure, power and downstream plan, and we will review the installation conditions.