What you need to decide which format to order. There are two standard formats for different purposes, and anything else is made to order.
The exact dimensions, thickness and catalyst loading are in the full specification table on the product pages. This chapter is only about which row of that table you want.
- Minimum orderOne sheet · no minimum value
- Lead timeStandard two weeks · custom approx. four weeks to two months
- CustomSize and thickness quoted per order
First timeDecide the format in the first section, then, if you need something non-standard, see the second section on custom orders.
Done this beforeThe lead time and the minimum order are what you need.
On this pageWhich format to choose
Which format to choose#
| Format | When | Watch for |
|---|---|---|
| Anode · laboratory format | For cutting to the active area you need. This is the large-area, thin one. | Being thin, it is less forgiving to handle. Keep it flat. |
| Anode · stack format | The format that goes into our own stacks. This is the thick one. | Its thickness has to suit your gasket stack-up, which changes the compression. |
| Cathode | One standard format, with a choice of Pt/C or PtRu/C catalyst. | Both cost the same; they differ in behaviour. Pt/C starts lower but lasts longer, and PtRu/C is the reverse. |
Made to order#
- What we can make
- Size and thickness to your specification, quoted per order. The same applies to both anode and cathode.
- Minimum order
- From a single sheet, with no minimum order value.
- Lead time
- Two weeks for a standard format and approx. four weeks to two months for a custom one, which takes longer because the substrate has to be brought in first. Tell us early if you have a test schedule.
- Inspection before shipment
- Dimensions and thickness measured and every piece visually inspected, custom orders included.
What to put in your order#
| Item | How to state it |
|---|---|
| Electrode | Anode (HXP-an) or cathode (HXP-ca) |
| Format | The format name together with its size and thickness. A name on its own costs an extra round of confirmation |
| Cathode catalyst | Pt/C or PtRu/C. If you have not decided, say so |
| Quantity | The number of sheets. If you will cut them, add the piece size and count and we will work out how many standard sheets that takes |
| If custom | Length, width and thickness |
| Where it will run | Whether the electrolyte is alkaline or something else |
| Schedule | The date your testing starts |
What this chapter is based on
- HXP-an datasheetPDF · 4.4 MB
- HXP-ca datasheetPDF · 2.3 MB
- Electrode operation noteWeb
- HXP electrode handling and operation guidePDF · 3.9 MB
Thank you. We read every answer.
Tell us what was missing and we will fix this page. Tell us what was missing →
Ask the engineer who built it
If your case is not covered here, send us the operating condition and what you observed. The engineer who designed the system answers directly.